Strategic and operational performance assessment at Athenaeum Construct

Proiect
8/10 (1 vot)
Domeniu: Engleză
Conține 1 fișier: doc
Pagini : 26 în total
Cuvinte : 5468
Mărime: 722.72KB (arhivat)
Publicat de: Angel Pașca
Puncte necesare: 8
Profesor îndrumător / Prezentat Profesorului: Carmen Paunescu
Academy of Economic Studies Faculty of Business Administration in Foreign Languages - English Section

Cuprins

  1. I. Introduction 3
  2. I.1 Company’s presentation 3
  3. I.2 History and financial evolution 5
  4. I.3 Company’s flow chart 6
  5. I.4. The constructions industry 7
  6. II. Process Management 8
  7. II.1 Management Process Map 10
  8. II.2 Resources Management Process Map 12
  9. II.3 Products/services Realization Process Map 13
  10. II.4 Measurement Process Map 14
  11. III. Strategic level Assessment 15
  12. III.1.Environment Management Program 16
  13. III.2. S.W.O.T. ANALYSIS 18
  14. IV. Operational level Assessment 19
  15. IV.1 List of processes. Authority and responsibility 19
  16. IV.2 Competitive forces on the constructions market 22
  17. V. Future 23
  18. VI. Conclusions and analysis 24
  19. VII. References 25

Extras din proiect

I. INTRODUCTION

The company that we chose for this project is S.C. ATHENAEUM CONSTRUCT S.A., an organization active on the Romanian constructions market.

The research for this paper was conducted through interviews with various company members and the sociologic method of structured observation, which took place at the company’s headquarters for a period of a week. We interviewed the quality manager and the production manager. We were also provided with various documents and presentation brochures of the company, in order to get familiarized with it.

The paper is structured as follows:

- An introductory part, where the company and the industry are presented.

- A chapter describing the company’s processes, its characteristics and the challenges it faces.

- An assessment of the strategic level.

- An assessment of the operational level.

- An analysis of the future of the company, including its growth strategy.

- Conclusions and recommendations / evaluation

I.1 COMPANY’S PRESENTATION

S.C. ATHENAEUM CONSTRUCT S.A. is a private company, founded in 1993 in Bucharest, with a highly motivated managerial system, comprising of engineers, economists and qualified workers, all with a rich experience in the constructions field. The company has the following identification marks:

- It is registered at the Bucharest Register of Trade with the number J40/10900/1993 following ruling number 846/02.04.93 given by the 5th District Tribunal.

- It has the registration code RO 5602554 and registration certificate B1126115.

- It operates under CAEN code 4521.

- Fiscal Code R5602554.

- Treasury account number RO11TREZ7065069XXX000953 at the 6th district Treasury.

- It is certified in the quality management domain by the Romanian Society for Quality Assurance with ISO 9001:2000, ISO 14001:2004, OHSAS 18001:2004, SA 8000:2001.

The company’s current headquarters is situated at number 9, Stefan Marinescu Street, district 6, Bucharest, telephone number 336.42.92.

S.C. ATHENAEUM CONSTRUCT S.A. is a company by shares with solely private capital that unfolds its activity in the following fields:

 Cultural and social constructions

 Private constructions

 Industrial constructions

 Related construction installations.

Quality is and has always been a serious and important issue for ATHENAEUM CONSTRUCT and is also the main reason for the current customer base.

The company’s quality strategy involves the dynamic involvement of all the staff members and workers in the sense of increasing competiveness through quality, with the ultimate goal of satisfying the clients’ demands and achieving the employees’ full satisfaction and prosperity. ATHENAEUM CONSTRUCT is certified in the quality management domain by the Romanian Society for Quality Assurance with:

- ISO 9001:2000 – the Quality Management System complies with the requirements for execution and repairing of civil, industrial constructions and related installations; execution and mounting of metallic structures.

- ISO 14001:2004 – the Environment Management System complies with the requirements for execution and repairing of civil, industrial constructions and related installations; execution and mounting of metallic structures.

- OHSAS 18001:2004 – the Occupational Heath and Safety Assessment Management System complies with the requirements for execution and repairing of civil, industrial constructions and related installations; execution and mounting of metallic structures.

- SA 8000:2001 – the Social Accountability Management System complies with the requirements for execution and repairing of civil, industrial constructions and related installations; execution and mounting of metallic structures.

The company’s most important works are:

Project name Client name

1. Modernization and expansion of the Fencing gymnasium Romanian Fencing Federation

Ana Pascu

2. Building A and B consolidation – N.P.P.I.

Normal and Pathological Physiology Institute D.Danielopolu, Prof. dr. M. Uluitu

3. Building consolidation - R.L.M Romanian Literature Museum, Al. Condeescu

4. Consolidation of the Clinical Emergency Hospital

Clinical Emergency Hospital Bucharest

Dr. R. Macovei

5. Consolidation – Clinical Hospital St. Mary Clinical Hospital St. Mary, Dr. N. Copca

6. Consolidation S.Y.M. Sports and Youth Ministry, Ing. M. Algiu

7. Consolidation – Clinical Hospital Filantropia – Maternity Clinical Hospital Filantropia

Dr. Gh. Peltecu

8. Consolidation – Clinical Hospital of Ophthalmological Emergencies Clinical Hospital of Ophthalmological Emergencies, Dr. M. Pop

9. Modernization and expansion of the Romanian Academy’s Library Romanian Academy, ing. C. Pistol

10. Rehabilitation of the treatment pavilion for tuberculosis Pneumoftiziology Institute

Marius Nasta , ing. C. Mitu

I.2 HISTORY AND FINANCIAL EVOLUTION

The company was started in 1993 by three visionary engineers with exclusively private, Romanian capital amounting around 10.000$. The businesses first possessions were a small rented house, a couple of office desks and a hand-full of enthusiast people. The initial associates took a huge risk in starting this business by leaving their steady jobs at state institutions and investing all the money they had saved up in an uncertain venture.

Preview document

Strategic and operational performance assessment at Athenaeum Construct - Pagina 1
Strategic and operational performance assessment at Athenaeum Construct - Pagina 2
Strategic and operational performance assessment at Athenaeum Construct - Pagina 3
Strategic and operational performance assessment at Athenaeum Construct - Pagina 4
Strategic and operational performance assessment at Athenaeum Construct - Pagina 5
Strategic and operational performance assessment at Athenaeum Construct - Pagina 6
Strategic and operational performance assessment at Athenaeum Construct - Pagina 7
Strategic and operational performance assessment at Athenaeum Construct - Pagina 8
Strategic and operational performance assessment at Athenaeum Construct - Pagina 9
Strategic and operational performance assessment at Athenaeum Construct - Pagina 10
Strategic and operational performance assessment at Athenaeum Construct - Pagina 11
Strategic and operational performance assessment at Athenaeum Construct - Pagina 12
Strategic and operational performance assessment at Athenaeum Construct - Pagina 13
Strategic and operational performance assessment at Athenaeum Construct - Pagina 14
Strategic and operational performance assessment at Athenaeum Construct - Pagina 15
Strategic and operational performance assessment at Athenaeum Construct - Pagina 16
Strategic and operational performance assessment at Athenaeum Construct - Pagina 17
Strategic and operational performance assessment at Athenaeum Construct - Pagina 18
Strategic and operational performance assessment at Athenaeum Construct - Pagina 19
Strategic and operational performance assessment at Athenaeum Construct - Pagina 20
Strategic and operational performance assessment at Athenaeum Construct - Pagina 21
Strategic and operational performance assessment at Athenaeum Construct - Pagina 22
Strategic and operational performance assessment at Athenaeum Construct - Pagina 23
Strategic and operational performance assessment at Athenaeum Construct - Pagina 24
Strategic and operational performance assessment at Athenaeum Construct - Pagina 25
Strategic and operational performance assessment at Athenaeum Construct - Pagina 26

Conținut arhivă zip

  • Strategic and Operational Performance Assessment at Athenaeum Construct.doc

Alții au mai descărcat și

Risk Management - A Science Or An Art

Strategies for identifying and measuring risk can help treasury personnel develop a sound diversification policy Before a risk profile can be...

The Evolution of Computer Science

The Evolution Of Computer Science The birth of computers and information technology goes back many centuries. The development of mathematics led...

11th of September 2001

The day of September 11th 2001 will remain as a dark day in history. All people know about this day and what happened at this date. On this day,...

The Tempest

Type of Work - Play Genre - Romance Language - Elizabethan English Time and place written - 16101611; England Tone - Dreamy,...

Test de engleză 3

Part Three: Gapped Text You are going to read a magazine article about a trip to Australia. Seven paragraphs have been removed from the article...

Prezentare a Mediului de Afaceri Argentinian

INTRODUCTION Essential facts about Argentina Geert Hofstede analysis over Argentina and the Latin American countries BUSINESS ETIQUETTE...

Ai nevoie de altceva?